Status board · last updated

Where the radio network stands.

The network is a plan: plan published; nothing on air; every seat open. This board tracks the work to get Radio El Segundo to its first four episodes, and what comes after. Owners are roles; an open seat has no one in it yet.

2 blocked

0 in progress

9 not started

6 done

Blocked

Publishing · owner: Mike Hoydich

Live on pointcast.xyz

Merged to main and the CI build is green, but the GitHub deploy step is skipped because the CLOUDFLARE_API_TOKEN repository secret is not set. Needs Mike to run scripts/deploy.sh or add the secret.

Phase 0 pilot · owner: Mike Hoydich

Week 1: Decide

Waiting on the open decisions below: name, talk-first or music-first, fiscal sponsor, first host.

Milestones

StatusTrackMilestoneOwnerNote
blocked Publishing Live on pointcast.xyz Mike Hoydich Merged to main and the CI build is green, but the GitHub deploy step is skipped because the CLOUDFLARE_API_TOKEN repository secret is not set. Needs Mike to run scripts/deploy.sh or add the secret.
blocked Phase 0 pilot Week 1: Decide · Launch kit Mike Hoydich Waiting on the open decisions below: name, talk-first or music-first, fiscal sponsor, first host.
not started Research Manus Phase 0 research Manus (browser and ops) Brief written at docs/briefs/2026-10-22-manus-radio-phase0.md; the research itself has not run.
not started Phase 0 pilot Week 2: Build · Launch kit Producer (open seat) Feed, stream test page, station IDs, printed consent form, story list.
not started Phase 0 pilot Week 3: Record · Launch kit Host (open seat) No episode recorded. Needs a host and the consent form reviewed by counsel.
not started Phase 0 pilot Week 4: Record · Launch kit Host (open seat) Second episode, first underwriting conversations, station rules page.
not started Phase 0 pilot Week 5: Bank · Launch kit Producer (open seat) Bank episodes 3 and 4; stream test on phones, a smart speaker and a car; Manus listener QA.
not started Phase 0 pilot Week 6: Launch · Launch kit Network editor (open seat) Publish episode 1, put up schedule cards with permission, count listeners.
not started Phase 1 station Station (Months 2–4): Radio El Segundo runs 24/7 on automation with live local windows. · Phases Station desk lead (open seat) Done when: Ten regular volunteers, five shows, 500 weekly listeners, first underwriting dollars.
not started Phase 2 network Network (Months 4–9): Five stations share one newsroom, one automation system and one network feed. · Phases Network editor (open seat) Done when: Five streams, one shared calendar and news desk, one over-the-air pilot, a published annual budget.
not started Phase 3 on the dial On the dial (Year 2): The network is on real radios and covers seven towns. · Phases Nonprofit partner and board (not chosen) Done when: Over-the-air signal in at least one town, seven stations, members paying part of the bills.
done Publishing Network plan published · PR #1466 Build agents The plan for Radio El Segundo and six sister stations, with the hour clock, schedule, signal paths, phases, budget and open decisions. Block 0718.
done Publishing Station pages and Phase 0 launch kit · PR #1494 Build agents Seven station pages with JSON twins, and the six-week kit for The Town Desk: rundown, gear, IDs, underwriting rules, consent form template. Block 0726.
done Publishing Project assignments on the jobs board Build agents RN-01 to RN-10 on /radio-network#assignments and /jobs/?project=radio. Educational briefs; applications are not open.
done Publishing MCP read tools: radio_network and radio_station Build agents Read-only tools on /api/mcp so agents can read the plan and any station. Live once deployed.
done Publishing This status board Product manager Dated board with milestones, blockers, decisions, risks and a changelog. Updated with each ship; tracking issue #1503.

Decisions waiting on Mike

From the plan's open decisions. Phase 0 week 1 cannot finish until the first four are made.

StatusDecisionDetailBlocks
blocked Network name The network name and whether to seek real call letters later. Station names on this page are working names. Phase 0 week 1
blocked Talk-first or music-first Talk-first or music-first launch. Talk first is cheaper to license. Phase 0 week 1
blocked Nonprofit partner or fiscal sponsor Which nonprofit partner or fiscal sponsor holds the money and, later, any license. Phase 0 week 1
blocked First host of The Town Desk Who hosts The Town Desk. Phase 0 week 1
blocked Synthetic voices on the conditions segment Whether synthetic voices read the conditions segment, or only hosts. Phase 0 and later
blocked LPFM channel study now or later Whether to pay for an LPFM channel study now or wait for an FCC window. Phase 0 and later

Risks

RiskImpactMitigation
The Los Angeles FM dial may have no usable LPFM frequencyHighStream first; HD subchannel lease as the over-the-air path; a channel study before any LPFM spending.
Music licensing cost and rulesMediumTalk-first launch keeps licensing small; get current SoundExchange and PRO numbers before music blocks.
Volunteer retentionMediumSmall weekly commitments, Listener Shift as a training slot, a clear ladder from contributor to host.
Consent form and station rules not yet reviewed by counselHighNo recording of neighbors until counsel signs off on the template.
Deploy blocker: merged work is not liveMediumMike runs scripts/deploy.sh, or adds the CLOUDFLARE_API_TOKEN secret so CI deploys on merge.
Nobody yet in any seatHighProject assignments and the print campaign aim at a first host and producer; week 1 cannot finish without them.

Changelog

  • 2026-10-22 Merged to main; CI build green; deploy step skipped (no CLOUDFLARE_API_TOKEN secret), so not yet live.
  • 2026-10-22 Eight-sheet concept print campaign at /radio-network/print. · Block 0741 · Block 0741
  • 2026-10-22 MCP read tools radio_network and radio_station, and this status board. · Block · PR #1517
  • 2026-10-22 Ten project assignments, RN-01 to RN-10, on the plan and the jobs board. · Block · PR #1514
  • 2026-10-22 Seven station pages, JSON twins and the Phase 0 launch kit. · Block 0726 · PR #1494
  • 2026-10-20 Network plan published at /radio-network with /radio-network.json. · Block 0718 · PR #1466