El Segundo automated residential solar permitting (SolarAPP+)
The city is in the SolarAPP+ pilot: instant permits for roof-mounted PV and storage on single-family homes, applied for and paid online by a licensed contractor. The city site blocks robots, so we confirmed the address through the search index. Open it in a browser.
elsegundo.gov ↗ EL SEGUNDO · ADDRESS CONFIRMED 2026-09-21 · PAGE BLOCKS ROBOTS
El Segundo Building and Safety Division
The counter for anything SolarAPP+ does not cover: ground mounts, subpanels, transfer switches, a DC bus through a wall. Ask before you drill.
elsegundo.gov ↗ UTILITY · SEEN 2026-09-21
SCE Solar Billing Plan (what people call NEM 3.0)
Export credits run roughly 3 to 23 cents a kWh depending on hour and season, highest 4 to 9 pm in June through September, plus a small residential adder. Storage is what makes exports worth anything. The interconnection request lives on this page.
sce.com ↗ UTILITY · SEEN 2026-09-21
SCE net energy metering (closed to new applicants)
NEM 2.0 closed on April 15, 2023. New systems go to the Solar Billing Plan. The application fee for systems under 1 MW was $94 when seen.
sce.com ↗ CALIFORNIA · SEEN 2026-09-21
CPUC customer generation and net billing
The regulator’s own page on the Net Billing Tariff in force since April 15, 2023. The CPUC never calls it NEM 3.0; the utilities and everyone else do.
cpuc.ca.gov ↗ CALIFORNIA · SEEN 2026-09-21
California Solar Consumer Protection Guide
Version 4, 2025, in nine languages. Any solar provider in California must hand it to you at first contact. Read it before you sign anything, including a lease.
cpuc.ca.gov ↗ CALIFORNIA · SEEN 2026-09-21
Self-Generation Incentive Program (SGIP)
The Residential Solar and Storage Equity budget opened June 2, 2025 with $1,100 per kWh of storage and $3,100 per kW of solar for qualifying low-income households, $280 million in all. Installer-applied, not DIY.
cpuc.ca.gov ↗ CALIFORNIA · SEEN 2026-09-21
SGIP applicant portal
The 2026 SGIP handbook, the step tracker and the waitlists. Southern California Edison is the program administrator for El Segundo.
selfgenca.com ↗ CALIFORNIA · SEEN 2026-09-21
GoGreen Home energy financing
State-backed loans for solar, batteries and efficiency with no lien on the house, open to SCE and SoCalGas customers, owners and renters with permission. It has a do-it-yourself section, which is rare.
gogreenfinancing.com ↗ CALIFORNIA · SEEN 2026-09-21
SB 868, the Plug and Play Solar Act — on the Governor’s desk
Passed the Assembly 73 to 0 on August 25 and the Senate 36 to 4 on August 26, enrolled to the Governor August 31, 2026. Deadline to sign or veto is September 30. Not signed when seen. If signed: up to 1,200 W AC per dwelling plugged into a standard receptacle, no interconnection application or fee, certified anti-backfeed equipment, effective January 1, 2027, sunset January 1, 2030. Until then plug-in solar is a grey area here.
leginfo.legislature.ca.gov ↗ CALIFORNIA · SEEN 2026-09-21
Plug-in solar explainer — Solar Rights Alliance
The plain-language page on what SB 868 does and does not allow, kept current by the group that carried it.
solarrights.org ↗ ELSEWHERE · SEEN 2026-09-21
Utah HB 340 — the first US plug-in solar law
Signed March 25, 2025, in force May 7, 2025. Up to 1,200 W AC at the inverter into a standard 120 V outlet, anti-islanding required, no permit or utility approval, no net metering. Passed 72 to 0 and 27 to 0. It is the template California’s bill follows.
pluginsolarutah.com ↗ FEDERAL · SEEN 2026-09-21
IRS: the 25D residential clean energy credit ended
No credit for expenditures after December 31, 2025, and an expenditure counts when the installation is completed, not when you paid. Credits earned before 2026 can still be carried forward. Price the ladder without it.
irs.gov ↗ FEDERAL · SEEN 2026-09-21
47 CFR 15.247 — the license-free 902–928 MHz band
Meshtastic, MeshCore and RNode radios operate here under Part 15: no licence, up to 1 W conducted for digital modulation, encryption allowed. Meshtastic caps North America at +30 dBm ERP. The eCFR itself blocks robots; this is Cornell’s mirror.
law.cornell.edu ↗ FEDERAL · SEEN 2026-09-21
47 CFR 97.113 — no obscured messages on amateur bands
Amateur radio forbids messages encoded to obscure their meaning, which is why an AREDN mesh cannot carry encrypted chat or HTTPS the way a Part 15 mesh can. Use the ham backbone for what it is good at and keep the phones on 915 MHz and Wi-Fi.
law.cornell.edu ↗ FEDERAL · SEEN 2026-09-21
ARRL — getting a Technician licence
Thirty-five questions and a $35 FCC application fee, good for ten years. The door to AREDN and to the Mt. Wilson links the South Bay hams already run.